Wholesale price of p235gh steel material steel plate
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
Wholesale price of p235gh steel material steel plate
Pageviews:
At present, the cutting thickness limit of laser cutting is 20 mm. However, it should be noted that oxygen will be added into the laser beam to cut 20 mm thick P235GH steel material steel plate, which will form a thin oxide film on the cutting surface, which may affect the cutting quality, Therefore, attention should be paid to this point to avoid problems.
16Mo3 alloy are featured by the good heat resistance and corrosion resistance. 16mo3 steel plate chemical composition(%):C: 0.12 ~ 0.2 Si: ≤0.35 Mn: 0.4 ~ 0.9 P: ≤0.025 S: ≤0.01 Cu: ≤0.3 Ni: ≤0.3 Cr: ≤0.3 Mo: 0.25 ~ 0.35 Al: ≥0.02 N: ≤0.012. 16Mo3 alloy steel mechanical properties:Yield strength (MPa) 372MPa, Tensile strength (MPa) 350MPa, Elongation (%) ≥22. Impact temperature (℃) 20, Impact energy value (J) 335J / cm². p235gh steel material, 16Mo3 steel plate is widely used in petroleum, chemical, power station, boiler and other industries.
The outer diameter of the hot-rolled seamless pipe is generally larger than 32mm, and the wall thickness is 2.5-75mm. The diameter of the cold-rolled seamless pipe can be 6mm, the wall thickness can be 0.25mm, the outer diameter of the thin-walled pipe can be 5mm, and the wall thickness is less than 0.25mm. The size accuracy of the cold-rolled seamless pipe is higher than that of the hot-rolled seamless pipe, p235gh steel material.
A few days ago, the relevant person in charge of China National Railway Group Co., Ltd. introduced that since the 18th National Congress of the Communist Party of China, 14 concentrated contiguous poverty-stricken areas, including old and poor, have completed a total of 3.3 trillion yuan in railway infrastructure investment, accounting for 78% of the total railway infrastructure investment; 36,000 kilometers of new lines were put into operation (20,000 kilometers of high-speed rail), accounting for 83% of the new lines put into operation in the country. Up to now, the railway network and 154 trackless stations on the whole road cover about 600 national-level poverty-stricken counties, accounting for 73% of the country's 832 poverty-stricken counties.