Non-secondary p355gh boiler material grade stockist in ohio
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
Non-secondary p355gh boiler material grade stockist in ohio
Pageviews:
Our company's P355GH boiler material grade power boilers, heating furnaces of double bars, double high lines and medium and thick plates all adopt heat storage technology, which can fully use blast furnace gas; the ladle baking, Maerz active lime kiln and medium and thick plate heat treatment furnace all burn converter gas, which can improve the p355gh boiler material grade utilization rate of secondary energy and realize negative energy steelmaking in steelmaking process.
30CrNi3MoV (675) high-strength steel is a new type of high-strength steel newly developed and put into use in China. It is a steel plate for armored vehicles. 30CrNi3MoV steel is developed by V microalloying on the basis of the original Cr-Ni-Mo series low-alloy ultra-high-strength steel, and appropriately adjusting the content of other alloying elements. The milling performance of 30CrNi3MoV steel is poor.
In April 2018, our Philiphine customer purchased 1008 Tons API5L Gr.B ERW&Q345B SMLS pipe for offshore oil field resources drilling project. This is a regular demand almost two month, and we has been cooperated more than three times, totally around 2100 tons steel pipe since 2015 year.
"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.