CALL US

+86-371-86151827

p265gh material for engineering and machine structural use

EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.

p265gh material for engineering and machine structural use

Pageviews:

After comprehensive and professional training such as customer service, the customer service team has more strict discipline in the management of customer service team to ensure that customer service personnel respond to customers with a professional attitude. A process supervision system has been set up to let each customer supervise the process of the system with us

Boiler steel mainly refers to materials used to make superheaters, main steam pipes and heating surfaces of boiler fire chambers. Boiler steel is a totally different material from P265GH material. The performance requirements for boiler steel are mainly good welding performance, certain high temperature strength, alkali corrosion resistance, and oxidation resistance. Commonly used boiler steels include open-hearth smelted low-carbon killed steel or electric furnace smelted low-carbon steel, with carbon content Wc in the range of 0.16%-0.26%. When manufacturing high-pressure boilers, pearlitic heat-resistant steel or austenitic heat-resistant steel is used. In recent years, ordinary low-alloy steel has also been used to build boilers.

asme sa514 grade K alloy steel element composition%C: 0.10-0.20, Si: 0.15-0.30, Mn: 1.10-1.50, P max.: 0.035, S max.: 0.035, Mo: 0.45-0.6.0, B: 0.001-0.005The mechanical properties in thickness (mm)T≤65Yield strength (≥Mpa): 690Tensile strength (Mpa):760-895Elongation in ≥,%: 18

If customers have any difficult problems during use of the steel materials, they can contact the company's after-sales service department to feedback the existing problems. The after-sales department will reply as soon as possible to ensure that each customer has a good after-sales experience. Under special circumstances, the after-sales service department will start the problem-solving process, and the engineers in charge of the area will quickly follow up to solve the problem.

Previous:What is the application of p265gh sheet Next:How to deal with iron oxide residual pro

Send us a message

Top