p265gh steel element hr plate stock
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
p265gh steel element hr plate stock
Pageviews:
Firmly establish the "people-oriented, safe development" concept, strictly follow the safety production policy of "safety first, prevention first, comprehensive management", strengthen and improve the management and supervision of safety production in an all-round way, and strive to improve the controllability of safety management And effectiveness, cultivate safety culture, improve long-term safety production mechanism, and build a harmonious BEBON.
Smelting process of P265GH steel element, container plate SPA-H weather-resistant steel: The molten iron for smelting SPA-H steel must be pretreated by molten iron desulfurization. Before entering the converter, the sulfur content of the molten iron is ≤0.010%, and the slag on the surface of the molten iron is cleaned. Nickel plates, copper particles or nickel-copper alloys are added to the converter with scrap steel. The carbon content of the converter smelting end is required to be less than 0.06% to prevent the molten steel from being oxidized.
37SiMn2MoV steel is high-grade quenched and tempered steel. p265gh steel element, 37SiMn2MoV steel has excellent comprehensive mechanical properties, good heat treatment process, good hardenability, low sensitivity to quenching crack, high resistance to tempering, very low temper brittleness, good high temperature strength and low temperature toughness. Chemical composition of 37SiMn2MoV steel: C: 0.33-0.39, Si: 0.60-0.90, Mn: 1.60-1.90, Mo 0.40-0.50, V: 0.05-0.12. After quenching and tempering, 37SiMn2MoV steel is usually used to manufacture heavy load and large section important parts.
In December of 2015, our regular India customer sent us an inquiry for p265gh steel element pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.