p355gh steel size steel width mm
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
p355gh steel size steel width mm
Pageviews:
From the name, we can clearly know that seamless pipe is seamless steel pipe, which is different from welded pipe. Seamless pipe is actually a kind of steel with hollow section. P355GH steel size, Seamless pipe has many advantages, such as: 1, the compressive capacity of seamless pipe is very good, the place with high bearing strength will not crack, and its bearing capacity is very good. 2. Seamless pipe has no welding point, so it is more corrosion-resistant and can bear larger pressure.
Today, the price of plate in major markets across the country rose and fell. As of now, the average price of 20mm plate p355gh steel size is 4033 yuan/ton, which is the same as the previous trading day. In the Kunming market, a small amount of steel plant resources have recently arrived. As of today, according to incomplete statistics, the total amount of social warehouses is about 19,200 tons, a decrease of 25 thousand tons from last week.
The hot rolling method is to heat the p355gh steel size steel material to about 1000 ℃ ~ 1250 ℃ and use the rolling mill to roll it. The traditional hot rolling process is generally divided into the following two steps: the first step is to use the primary rolling mill or billet rolling mill to roll the ingot, billet or continuous casting billet into a certain shape and size of billet. This kind of p355gh steel size rolling process is usually called semi-finished product production, also called blank production.
How to choose the material and specification of p355gh steel size, boiler tube? First, select the specification according to the actual use. Secondly, material: the suitable boiler tube material is different for different use scenarios. Thirdly, the wall thickness of the boiler tube should be strictly in accordance with the relevant standards. If the thickness is not up to standard, it is easy to cause accidents, so it must be strictly controlled. Finally, the boiler tube should be checked in time when receiving the goods, and the relevant instruments should be used to detect whether the steel quality has reached the standard, if not, it can be rejected.