high strength p235gh steel I beams
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
high strength p235gh steel I beams
Pageviews:
The steel plate used for containers and pressure vessel has to bear different pressures and strengths due to the manufactured containers. The normal pressure is generally 31.4MPa or higher; the working temperature is usually between -20 ℃ -450 ℃, and sometimes lower than -20 ℃. According to the working conditions and processing technology of the container, the high strength P235GH steel, steel plate used for the container must have good cold bending and welding performance. Besides, it should have good plasticity and toughness, high temperature short-term strength or long-term strength performance.
In terms of service, our service is a "one-stop" way of working. We have our own high strength p235gh steel processing plant and pretreatment plant, pretreatment of ship steel (shot blasting, derusting, painting). Technical parameters of steel plate and profile steel surface pretreatment production line. We can also let customers enjoy our other pretreatment services, such as high strength p235gh steel cutting, welding, drilling, galvanizing, etc., at the lowest cost.
"Our mill has three production lines:1).2500mm production line (Width: 1600-2300mm, high strength p235gh steel Thickness: 6-30mm, Annual capacity: 1,600,000 Tons; 2).3500mm production line (Width: 2000-3050mm, Thickness: 10-80mm, Annual capacity: 2,000,000 Tons; 3).4300mm production line (Width: 1500-4100mm, Thickness: 6-300mm, Annual capacity: 1,800,000 Tons; The weight of each ingot can reach high strength p235gh steel 44 tons, which is at the leading level in China. In addition, we have a 1700mm hot-rolled coil production line (width range: 900-1550mm, thickness range: 1.2-25.4mm, annual high strength p235gh steel production capacity: 3.5 million tons."
After the steel plate is produced from the original factory, it will pass through a series of transportation and storage links and then be delivered to the processing workshop. During this period of time, the steel plate surface will contact with the air continuously, which will inevitably produce a layer of oxide skin. The oxide skin is a difficulty in the treatment process. It has high melting point, is not easy to burn and dissolve, increases preheating time, reduces cutting speed. Therefore, the surface of the high strength p235gh steel plate should be derusted before cutting.
We should help solve the customer's problems in time, not just verbally, without solving the problems or shirking the responsibility. Improving after-sales efficiency can make customers feel respect. We should take their problems seriously and show sincerity. It can also give customers a good impression and reduce the negative impact.