p355gh material equivalent name in different countries
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
p355gh material equivalent name in different countries
Pageviews:
With the development of API5L-B pipeline steel plate technology and the advancement of welded pipe forming and welding technology, the application scope of pipeline welded pipe is gradually expanding, especially the advantages of welded pipe in the range of large-diameter group spacing are more obvious. In 2004, the output of API5L-B (L245) seamless line pipe was about 400,000 tons. The steel grade includes X42-70, P355GH material equivalent, and the varieties include onshore line pipe and subsea line pipe.
p355gh material equivalent, NM360 wear-resistant plates have two wear resistance performance methods: one is high stress wear, and the other is chisel wear. For high-stress wear, NM360 wear-resistant plates require the surface of the liner to have the highest possible hardness to resist the pressure of abrasives. The scope of application of NM360 wear-resistant plates reduces the appearance of embrittlement and falling.
Preheating cutting: The most effective way to prevent steel plate cutting cracks is to preheat before cutting. Before flame cutting, the steel plate is usually preheated, and the preheating temperature mainly depends on the quality level and thickness of the steel plate. The preheating method can be carried out with flame burner, electronic heating pad, or heating furnace. In order to determine the preheating effect of the steel plate, the required temperature should be tested at the heating point.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.