The hot rolling technolodge of p235gh steel plate
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
The hot rolling technolodge of p235gh steel plate
Pageviews:
Pipeline steel plays an important role in pipeline transportation. How many types of P235GH steel plate, pipeline steel are there? At present, pipeline steel can be divided into the following four categories according to microstructure. First, pearlitic pipeline steel. The basic components of pearlitic pipeline steel are carbon and manganese, generally speaking, the content is 0.10% - 0.20%, and the manganese content is 1.30% - 1.70%. It is generally produced by hot rolling or normalizing heat treatment process. Second, acicular ferrite pipeline steel. Third, martensitic pipeline steel. Fourth, tempered sorbite pipeline steel.
A small amount of Nb is sufficient to obtain excellent comprehensive properties of p235gh steel plate etc. steel material, because at low Nb concentration, the yield strength of steel material increases faster and is proportional to the concentration, but when the Nb content is greater than 0.03%, the strengthening effect begins to decrease. Studies have shown that when the Nb content is greater than 0.06%, excess Nb will no longer strengthen the steel material.
The location weld of p235gh steel plate, wear-resistant steel plate is only allowed to be welded on the base metal surface with the electric welding rod for welding the base metal; in the welding of the base course, the base weld shall be strictly prevented from melting to the transition layer or even the multiple layer weld of stainless steel, so as to prevent a small amount of high chromium and high nickel surfacing wear-resistant steel plate components diluted into the carbon steel weld to form martensite structure and harden.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.