The normalizing technology of p235gh steel plate
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
The normalizing technology of p235gh steel plate
Pageviews:
The outer diameter of the hot-rolled seamless pipe is generally larger than 32mm, and the wall thickness is 2.5-75mm. The diameter of the cold-rolled seamless pipe can be 6mm, the wall thickness can be 0.25mm, the outer diameter of the thin-walled pipe can be 5mm, and the wall thickness is less than 0.25mm. The size accuracy of the cold-rolled seamless pipe is higher than that of the hot-rolled seamless pipe, P235GH steel plate.
Hot-rolled steel sheet / cold-rolled steel sheet: Steel ingots or slabs are difficult to deform at normal temperature and difficult to process. They need to be heated to 1100 ° C to 1250 ° C for rolling. This p235gh steel plate rolling process is called hot rolling. Rolling at room temperature is generally understood as cold rolling. However, from the point of view of metallurgy, the boundary between hot rolling and cold rolling should be distinguished by the temperature of metal recrystallization, that is, rolling below the recrystallization temperature is cold rolling; Rolling above the recrystallization temperature is hot rolling.
Water cutting machine is called water knife for short, that is, water is used as knife. High pressure water jet cutting technology can perform any curve cutting process on any material, p235gh steel plate included. The heat generated in the cutting process will be immediately taken away by the water jet without harm. Material, no need or easy to reprocess after cutting, safety and environmental protection, faster, faster, more efficient.
We had a wonderful trip in Phuket Island, Thailand. At the end of 2019, in order to thank employees for their hard work for a year and enrich their lives, our company organized a pleasant trip to Phuket Island, Thailand. The tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5 o'clock in the afternoon on the 22th December.