What is p235gh steel used for gas standard
EN-BOILER Steel provides high-quality boiler steel to many natural gas.
Oil and petrochemical companies and is well-known worldwide.
What is p235gh steel used for gas standard
Pageviews:
The main reference for structural design of steel structure engineering is the static and dynamic characteristics of the steel used under various actions, such as elasticity, plasticity, strength, toughness, fatigue and other mechanical properties. Therefore, the P235GH steel used for gas and so on steel used in the construction of steel structure engineering will limit its strength, plasticity, impact toughness and weldability. Steel structure engineering requires high tensile strength and yield point of steel. High yield point can reduce the cross-section of the component, so as to reduce the weight, save steel and reduce the cost. High tensile strength can increase the safety of the structure.
p235gh steel used for gas Tianjin inventory: 7*2920*8200, 15*2992*10185, 40*3050*5800, 14*1950*10700, 50*2500*12000, 20.9*2851*7000, 16*2120*6080, 20*1950*9350, 26*2200*12000, 20*2933*7300, 12.5*2900*11000, 40*3050*4200, 20*1950*9750, 15*2992*10185, 16*2230*7650, 14*2150*8500, 50*2200*12000, 16*2120*6080, 70*2500*12000.
Titanium microalloying is an element of p235gh steel used for gas strengthening complex with carbon and nitrogen. The addition of micro amount of titanium in the steel can fix almost all nitrogen and part carbon in the steel, so as to eliminate the strain aging phenomenon and improve the aging impact performance of the steel. At the same time, it can refine the grains and change the morphology of the compounds. According to the atomic weight ratio of Ti and N in p235gh steel used for gas tin formula (Ti = 3.4n), the content of Ti in steel should be controlled between 0.015 and 0.025%. Generally, the amount of ferrotitanium added to each ton of steel is 1kg.
p235gh steel used for gas, Hot rolled seamless tube is usually produced on automatic tube rolling mill. After the solid tube blank is inspected and the surface defects are removed, it is cut to the required length, centered on the end face of the piercing end of the tube blank, then sent to the heating furnace for heating, and perforated on the piercing machine.